Project description
The New Malden warehouse project involved the precision installation of a reinforced concrete slab, providing a durable and level foundation for industrial operations.
Our team delivered:
Ground preparation and leveling for optimal slab performance
Reinforced concrete pouring to meet heavy-duty warehouse load requirements
Smooth finishing and curing for maximum durability and longevity
This project ensures the warehouse operates on a robust, low-maintenance foundation built to withstand demanding industrial use.